Project Details:
Industry: Public
Location: Narragansett, RI
Services: Site/Civil Engineering; Regulatory Permitting; Surveying
Industry: Public
Location: Narragansett, RI
Services: Site/Civil Engineering; Regulatory Permitting; Surveying
The state’s fourth-longest bike path is adding a 1,375 ft extension which will create a safe crossing to the path. The William C. O’Neill Bike Path, also known as The South County Bike Path, currently stretches 7 miles from Kingston Station in South Kingstown to Mumford Road in Narragansett. When complete, the path will be approximately 8 miles long.
The Department of Environmental Management/Green Economy bond funded project, named Phase 4A, will be located on town property behind the Narragansett Elementary School playground and the Community Center’s athletic fields.
DiPrete Engineering is handling the project’s surveying, engineering, permitting, and design.
Providence Office
Two Stafford Court
Cranston, RI 02920
(401) 943-1000
Newport Office
90 Broadway
Newport, RI 02840
(401) 619-5890
Boston Office
105 Eastern Avenue Suite 200
Dedham, MA 02026
(781) 326-0021
Worcester Office
321 Fortune Blvd., Suite 201
Milford, MA 01757
© 2024 DiPrete. All Rights Reserved. | Web Design by Black Door Creative